Lagos State Emergency Management Agency (LASEMA) has pulled down Four two-storey buildings under construction in Ikoyi.

Eye9ja reports that the buildings were brought down after they failed some measure of integrity tests.

Eye9ja reports that the emergency management agency brought down the building with a view of curbing the recent incidents of collapsed building recorded in the state.

This disclosure was made in Lagos on Saturday, November 2nd by LASEMA Director-General, Dr Olufemi Oke-Osanyintolu.

Oke-Osanyintolu disclosed that the four buildings under construction at Glover Court, Ikoyi, were in the same compound where a building collapsed on Friday.

“The test was conducted by Solid Material Testing Agency, Lagos State Building Control Agency and the Ministry of Physical Planning.

“The test was conducted following rescue of four persons and recovery of one body in the collapsed building at 4:10p.m on Friday.

“The decision to pull down the buildings is to avert further loss of lives and property. The operation is now completed,” Oke-Osanyintolu said.

Facebook Comments
Eye 9ja is a digital news platform, strategically focussed on identifying, bringing into limelight the eluded gists in every news